Wash. Admin. Code § 173-186-330
(2) The plan holder or contracted primary response contractors must have equipment capable of arriving within the time frames outlined in the table below:
| Time (hours) | Capability |
| 6 | Initiate an assessment and consultation regarding the potential for the spilled oil to submerge or sink. |
| 6-12 | Resources to detect and delineate the spilled oil such as side scan or multibeam sonar, sampling equipment, divers, remotely operated vehicles or other methods to locate the oil on the bottom or suspended in the water column could have arrived. |
| Additionally, containment boom, sorbent boom, silt curtains, or other methods for containing the oil that may remain floating on the surface or to reduce spreading on the bottom could have arrived. | |
| 12-24 | Resources and equipment necessary to assess the impact of the spilled oil on the environment oil could have arrived. |
| Dredges, submersible pumps, or other equipment necessary to recover oil from the bottom and shoreline could have arrived. |
[Statutory Authority: RCW 90.56.210. WSR 20-01-097 (Order 18-04), § 173-186-330, filed 12/12/19, effective 1/18/20; WSR 16-18-052 (Order 15-14), § 173-186-330, filed 8/31/16, effective 10/1/16.]