Your environmental assessment and analysis must, at a minimum, describe:
(1) The environment within the ASR project area, including:
- (a) Proximity to contaminated areas;
- (b) Present and prior land use(s) within the ASR project area;
- (c) Location(s) of historical or existing wetland habitat(s);
- (d) Location(s) of historical or existing flood plain(s);
(e) Location(s) of historical or existing surface water body or spring, including documented:
- (i) Base flows;
- (ii) Seven-day low flows;
- (iii) Maximum flows.
(2) Adverse impacts to the surrounding environment by the ASR project, including, but not limited to:
- (a) Slope stability;
- (b) Wetland habitat;
- (c) Flood plain;
- (d) Ground deformation;
- (e) Surface water body or spring.
- (3) If an environmental assessment has already been performed for the purposes of this specific ASR project, the application may simply refer to that documentation and need not repeat that analysis.
[Statutory Authority: RCW 90.03.370 (2)(b) and 90.44.460. WSR 03-03-081 (Order 02-06), § 173-157-150, filed 1/15/03, effective 2/15/03.]