Wash. Admin. Code § 136-130-020
The county road administration board has determined that the interests of the counties in the several regions will be best served by encouraging development of distinct project priority rating systems for each region.
There shall be five project types eligible for RATA funding, with each having separate rating systems for project ranking and selection. The five project types include:
(5) Bridge and drainage structures - Replacement or major rehabilitation of an existing bridge or other drainage structure, and may include additional travel lanes and right of way costs. The bridge or drainage structure(s) cost must be a minimum of 50 percent of the overall project cost.
(b) All non-NBI structures are eligible for replacement of the existing structure.
In consultation with the individual regions, the executive director shall approve the various forms and procedures necessary to allocate available RATA funding, consistent with RCW 36.79.080.
These project types shall be available for each region, and no regional sublimits shall apply for project types.
[Statutory Authority: RCW 36.78.070. WSR 23-23-013, § 136-130-020, filed 11/2/23, effective 12/3/23. Statutory Authority: Chapter 36.78 RCW. WSR 21-22-083, § 136-130-020, filed 11/1/21, effective 12/2/21; WSR 19-04-047, § 136-130-020, filed 1/29/19, effective 3/1/19; WSR 11-05-005, § 136-130-020, filed 2/3/11, effective 3/6/11. Statutory Authority: Chapter 36.79 RCW. WSR 99-01-021, § 136-130-020, filed 12/7/98, effective 1/7/99. Statutory Authority: Chapter 36.78 RCW. WSR 84-16-065 (Order 56), § 136-130-020, filed 7/30/84.]