Wash. Rev. Code § 78.56.090
(3) The primary screening phase will consist of, but not be limited to, siting criteria based on considerations as to location as follows:
(4) The department of ecology, through the primary screening process, shall reduce the available tailings facility sites to one or more feasible locations whereupon a technical site investigation phase shall be conducted by the department for the purpose of verifying the adequacy of the remaining potential sites. The technical site investigations phase shall consist of, but not be limited to, the following:
[ 1994 c 232 s 9.]