Wash. Rev. Code § 43.52.567
(2) The definitions in this subsection apply throughout this section unless the context clearly requires otherwise.
(b) "Qualified hydropower" means the energy produced either:
(c) "Renewable electrical energy generation project" means electrical generation facilities that are fueled by:
(3) The selection of a contractor shall be made in an open public meeting, as part of a public record, and in accordance with the following procedures:
[ 2006 c 176 s 1.]