A. All GCS wells required by 9VAC25-91-170 A 13 a in the ODCP requirements shall be monitored as follows:
1. Monthly gauging of GCS groundwater monitoring wells.
- a. Measure and record static water levels monthly.
- b. Reference all water-level measurements, including total well-depth measurements, from an established and documented point on the top of the well casing.
- c. Measurements shall be correlated with mean sea level datum and measured to the nearest 0.01 foot.
2. Quarterly groundwater and vapor monitoring.
- a. Quarterly vapor monitoring of all GCS wells identified in the ODCP-GCS shall be conducted prior to collecting quarterly groundwater samples.
- b. Quarterly vapor monitoring consists of collecting one monitoring well headspace measurement.
c. Quarterly groundwater sampling (visual inspection) of all wells identified in the ODCP-GCS shall be conducted.
- (1) Measure for free product on top of the groundwater.
- (2) Collect groundwater samples for visual inspection.
- d. Tabulate vapor measurements and quarterly visual groundwater monitoring results for each well sampled.
3. Annual groundwater monitoring for laboratory analysis.
- a. Annual groundwater sampling of all wells identified in the ODCP groundwater characterization study (GCS) shall be conducted.
- b. Annual groundwater monitoring consists of collecting groundwater samples for laboratory analysis.
- c. Groundwater samples shall be collected and analyzed for BTEX and TPH for each well.
- B. The GCS groundwater well monitoring should not be confused with the monitoring of groundwater wells utilized to satisfy 9VAC25-91-170 A 18 (i.e., leak detection wells).
Statutory Authority
§§ 62.1-44.2, 62.1-44.15, 62.1-44.34:15, 62.1-44.34:15.1 and 62.1-44.34:19.1 of the Code of Virginia.
Historical Notes
Derived from Virginia Register Volume 14, Issue 18, eff. June 24, 1998.