9 Va. Admin. Code § 25-790-990
A. Compliance information. The following information is being provided to demonstrate to the department that the owner* will remain in compliance, after the addition of the proposed pumping station indicated below:
4. Number of portable pumps/generators required:**
5. Number of portable pumps or generators*** owned by owner:
Note: *When the proposed pump station will be transferred to city ownership and operation, then this analysis will be made for the city-wide system. If the pump station is to remain under a private owner's control, then the analysis will be performed for that owner's system only.
**The number of portable pumps/generators required is the larger number of either A 4 a or A 4 b of this form.
***Portable equipment, either singly or in combination, shall be capable of operating the largest pump station included in the total for A 3 of this form.
B. Compliance agreement. This agreement certifies that:
2. This station and associated portable equipment will be maintained and operated in accordance with the owner's approved operation and maintenance program.
Name
Title
Date
Note: *Time transpiring between high liquid level alarm and the time that an overflow or backup and subsequent discharge occurs (to be determined at peak design flow).
**Time transpiring between high liquid level alarm and connection and starting of portable equipment.
Article 2
Forms and Agreements
§ 62.1-44.19 of the Code of Virginia.
Former 12VAC5-581-1050 derived from Virginia Register Volume 18, Issue 10, eff. February 27, 2002; amended and adopted as 9VAC25-790-990, Virginia Register Volume 20, Issue 9, eff. February 12, 2004.