9 Va. Admin. Code § 25-790-310
C. Factors. In determining the required capacities of sanitary sewers, the following factors shall be considered:
D. Capacity. New sewer system capacity shall be designed on the basis of an average daily per capita flow of sewage of not less than that set forth in Table 3 (9VAC25-790-460) of this chapter. These figures are assumed to include infiltration but do not address inflow. When deviations from the foregoing per capita rates and established peak flow factors are proposed, a description of the procedure used to establish those design flows shall be included with the submission for the purpose of this chapter, the following list defines the various collection system components that are to be designed to transmit peak flow rates:
4. "Interceptor" means a sewer that receives sewage flow from a number of gravity mains, trunk sewers, sewage force mains, etc.
The minimum peak design capacity for lateral and submain sewers should be 400% of the average design flow.
Minimum peak design capacity of main, and trunk, sewers should be 250% of the average design flow.
Minimum peak design for interceptor sewers shall be 200% of the average design flow.
Article 1
Collection and Conveyance Sewers
§ 62.1-44.19 of the Code of Virginia.
Former 12VAC5-581-370 derived from Virginia Register Volume 18, Issue 10, eff. February 27, 2002; amended and adopted as 9VAC25-790-310, Virginia Register Volume 20, Issue 9, eff. February 12, 2004.