A. The rainwater harvesting system designer with the consent of the owner may make certain design changes to a proposed rainwater harvesting system for which a valid construction permit has been issued without prior approval from the department if:
- 1. The design change does not change the design flow, the proposed filtration means and standard, the proposed disinfection means and standard, or the log reduction targets;
- 2. The changed design for the rainwater harvesting system complies with applicable statutes, codes, and regulations;
- 3. The designer provides the department with complete documentation, including a list of changes and revised specifications, calculations, and drawings as part of a revised design package; and
- 4. The designer and owner ensure that design changes are communicated to the installer of the rainwater harvesting system.
- B. The commissioner may suspend or revoke a construction permit if a design change made to the proposed rainwater harvesting system does not comply with this chapter. If the commissioner revokes the construction permit, the owner must submit a new application before continuing with the installation of the rainwater harvesting system.
- C. The commissioner shall review changes made to the rainwater harvesting system before issuing an operation permit pursuant to 12VAC5-635-170.
Statutory Authority
§§ 32.1-12 and 32.1-248.2 of the Code of Virginia.
Historical Notes
Derived from Virginia Register Volume 41, Issue 5, eff. November 20, 2024.