Va. Code Ann. § 56-581.2
A. As used in this section:
"Electrical distribution infrastructure" means equipment, structures, and associated engineering and civil construction work designed to support electric vehicle charging stations, including poles, vaults, service drops, transformers, mounting pads, trenching, conduit, wire, cable, meters, and other necessary equipment.
"Fast-charging station" means a charging system capable of delivering at least 50 kilowatts of direct current electrical power to an electric vehicle's rechargeable battery at a voltage of 200 volts or greater.
"Historically economically disadvantaged community" has the same meaning as provided in § 56-576.
"Phase I Utility" and "Phase II Utility" have the same meanings as provided in subdivision A 1 of § 56-585.1.
"Rural community" means a city with a population density of less than 1,470 people per square mile or a county with a population density of less than 160 people per square mile.
"Transportation electrification" means the use of electricity from external sources to power all or part of passenger vehicles, trucks, buses, trains, boats, or other equipment that transport materials, goods, or people.
D. Each Phase I and Phase II Utility shall file by February 1, 2028, and every three years thereafter, transportation electrification plans to accelerate widespread transportation electrification across the Commonwealth in a manner designed to achieve the most reasonable and prudent utility investments in transportation electrification throughout the utility's service territory, which shall include rural communities and historically economically disadvantaged areas. Such transportation electrification plans shall consider potential rate designs, incentives, investments, and programs designed to accelerate transportation electrification in a reasonable and prudent manner and shall seek to minimize overall costs and maximize overall benefits to utility customers. Such plans shall include:
E. In reviewing transportation electrification plans filed pursuant to subsection D, the Commission shall consider whether such plans can be reasonably expected to:
2026, cc. 26, 27.