Va. Code Ann. § 10.1-1408.1
B. No application for (i) a new solid waste management facility permit or (ii) application for a permit amendment or variance allowing a category 2 landfill, as defined in this section, to expand or increase in capacity shall be complete unless it contains the following:
4. If the applicant proposes to operate a new sanitary landfill or transfer station, a statement, including a description of the steps taken by the applicant to seek the comments of the residents of the area where the sanitary landfill or transfer station is proposed to be located, regarding the siting and operation of the proposed sanitary landfill or transfer station. The public comment steps shall be taken prior to filing with the Department the notice of intent to apply for a permit for the sanitary landfill or transfer station as required by the Department's solid waste management regulations. The public comment steps shall include publication of a public notice once a week for two consecutive weeks in a newspaper of general circulation serving the locality where the sanitary landfill or transfer station is proposed to be located and holding at least one public meeting within the locality to identify issues of concern, to facilitate communication and to establish a dialogue between the applicant and persons who may be affected by the issuance of a permit for the sanitary landfill or transfer station. The public notice shall include a statement of the applicant's intent to apply for a permit to operate the proposed sanitary landfill or transfer station, the proposed sanitary landfill or transfer station site location, the date, time and location of the public meeting the applicant will hold and the name, address and telephone number of a person employed by the applicant, who can be contacted by interested persons to answer questions or receive comments on the siting and operation of the proposed sanitary landfill or transfer station. The first publication of the public notice shall be at least fourteen days prior to the public meeting date.
The provisions of this subdivision shall not apply to applicants for a permit to operate a new captive industrial landfill or a new construction-demolition-debris landfill;
C. Notwithstanding any other provision of law:
D.
E. The permit shall contain such conditions or requirements as are necessary to comply with the requirements of this Code and the regulations of the Board and to protect present and future human health and the environment. To the extent allowed by federal law, any person holding a permit that is intending to upgrade the permitted solid waste management facility by installing technology, control equipment, or other apparatus that the permittee demonstrates to the satisfaction of the Director will result in improved energy efficiency, protect waters of the state, including both surface and ground water, and protect air quality shall not be required to obtain a modified or amended permit.
The Director may include in any permit such recordkeeping, testing and reporting requirements as are necessary to ensure that the local governing body of the county, city or town where the waste management facility is located is kept timely informed regarding the general nature and quantity of waste being disposed of at the facility. Such recordkeeping, testing and reporting requirements shall require disclosure of proprietary information only as is necessary to carry out the purposes of this chapter. At least once every ten years, the Director shall review and issue written findings on the environmental compliance history of each permittee, material changes, if any, in key personnel, and technical limitations, standards, or regulations on which the original permit was based. The time period for review of each category of permits shall be established by Board regulation. If, upon such review, the Director finds that repeated material or substantial violations of the permittee or material changes in the permittee's key personnel would make continued operation of the facility not in the best interests of human health or the environment, the Director shall amend or revoke the permit, in accordance herewith. Whenever such review is undertaken, the Director may amend the permit to include additional limitations, standards, or conditions when the technical limitations, standards, or regulations on which the original permit was based have been changed by statute or amended by regulation or when any of the conditions in subsection B of § 10.1-1409 exist. The Director may deny, revoke, or suspend any permit for any of the grounds listed under subsection A of § 10.1-1409.
I. No person shall allow waste to be disposed of on his property without a permit. Any person who removes trees, brush, or other vegetation from land used for agricultural or forestal purposes shall not be required to obtain a permit if such material is deposited or placed on the same or other property of the same landowner from which such materials were cleared. The Board shall by regulation provide for other reasonable exemptions from permitting requirements for the disposal of trees, brush and other vegetation when such materials are removed for agricultural or forestal purposes.
When promulgating any regulation pursuant to this section, the Board shall consider the character of the land affected, the density of population, and the volume of waste to be disposed, as well as other relevant factors.
K. The Board shall provide for reasonable exemptions from the permitting requirements, both procedural and substantive, in order to encourage the development of yard waste composting facilities. To accomplish this, the Board is authorized to exempt such facilities from regulations governing the treatment of waste and to establish an expedited approval process. Agricultural operations receiving only yard waste for composting shall be exempt from permitting requirements provided that (i) the composting area is located not less than 300 feet from a property boundary, is located not less than 1,000 feet from an occupied dwelling not located on the same property as the composting area, and is not located within an area designated as a flood plain as defined in § 10.1-600; (ii) the agricultural operation has at least one acre of ground suitable to receive yard waste for each 150 cubic yards of finished compost generated; (iii) the total time for the composting process and storage of material that is being composted or has been composted shall not exceed eighteen months prior to its field application or sale as a horticultural or agricultural product; and (iv) the owner or operator of the agricultural operation notifies the Director in writing of his intent to operate a yard waste composting facility and the amount of land available for the receipt of yard waste. In addition to the requirements set forth in clauses (i) through (iv) of the preceding sentence, the owner and operator of any agricultural operation that receives more than 6,000 cubic yards of yard waste generated from property not within the control of the owner or the operator in any twelve-month period shall be exempt from permitting requirements provided (i) the owner and operator submit to the Director an annual report describing the volume and types of yard waste received by such operation for composting and (ii) the operator shall certify that the yard waste composting facility complies with local ordinances. The Director shall establish a procedure for the filing of the notices, annual reports and certificates required by this subsection and shall prescribe the forms for the annual reports and certificates. Nothing contained in this article shall prohibit the sale of composted yard waste for horticultural or agricultural use, provided that any composted yard waste sold as a commercial fertilizer with claims of specific nutrient values, promoting plant growth, or of conditioning soil shall be sold in accordance with Chapter 36 (§ 3.2-3600 et seq.) of Title 3.2. As used in this subsection, "agricultural operation" shall have the same meaning ascribed to it in § 3.2-300.
The operation of a composting facility as provided in this subsection shall not relieve the owner or operator of such a facility from liability for any violation of this chapter.
N. Every solid waste management facility shall be operated in compliance with the regulations promulgated by the Board pursuant to this chapter. To the extent consistent with federal law, those facilities which were permitted prior to March 15, 1993, and upon which solid waste has been disposed of prior to October 9, 1993, may continue to receive solid waste until they have reached their vertical design capacity, provided that the facility is in compliance with the requirements for liners and leachate control in effect at the time of permit issuance, and further provided that on or before October 9, 1993, the owner or operator of the solid waste management facility submits to the Director:
3. A statement signed by the owner or operator (i) that the facility complies with applicable financial assurance regulations and (ii) estimating when the facility will reach its vertical design capacity.
The facility may not be enlarged prematurely to avoid compliance with state or federal regulations when such enlargement is not consistent with past operating practices, the permit or modified operating practices to ensure good management.
Facilities which are authorized by this subsection to accept waste for disposal beyond the waste boundaries existing on October 9, 1993, shall be as follows:
Category 1: Nonhazardous industrial waste facilities that are located on property owned or controlled by the generator of the waste disposed of in the facility;
Category 2: Nonhazardous industrial waste facilities other than those that are located on property owned or controlled by the generator of the waste disposed of in the facility, provided that the facility accepts only industrial waste streams which the facility has lawfully accepted prior to July 1, 1995, or other nonhazardous industrial waste as approved by the Department on a case-by-case basis; and
Category 3: Facilities that accept only construction-demolition-debris waste as defined in the Board's regulations.
The Director may prohibit or restrict the disposal of waste in facilities described in this subsection which contains hazardous constituents as defined in applicable regulations which, in the opinion of the Director, would pose a substantial risk to health or the environment. Facilities described in category 3 may expand laterally beyond the waste disposal boundaries existing on October 9, 1993, provided that there is first installed, in such expanded areas, liners and leachate control systems meeting the applicable performance requirements of the Board's regulations, or a demonstration is made to the satisfaction of the Director that such facilities satisfy the applicable variance criteria in the Board's regulations.
Owners or operators of facilities which are authorized under this subsection to accept waste for disposal beyond the waste boundaries existing on October 9, 1993, shall ensure that such expanded disposal areas maintain setback distances applicable to such facilities under the Board's current regulations and local ordinances. Prior to the expansion of any facility described in category 2 or 3, the owner or operator shall provide the Director with written notice of the proposed expansion at least sixty days prior to commencement of construction. The notice shall include recent groundwater monitoring data sufficient to determine that the facility does not pose a threat of contamination of groundwater in a manner constituting an open dump or creating a substantial present or potential hazard to human health or the environment. The Director shall evaluate the data included with the notification and may advise the owner or operator of any additional requirements that may be necessary to ensure compliance with applicable laws and prevent a substantial present or potential hazard to health or the environment.
Facilities, or portions thereof, which have reached their vertical design capacity shall be closed in compliance with regulations promulgated by the Board.
Nothing in this subsection shall alter any requirement for groundwater monitoring, financial responsibility, operator certification, closure, postclosure care, operation, maintenance or corrective action imposed under state or federal law or regulation, or impair the powers of the Director pursuant to § 10.1-1409.
1988, cc. 696, 891; 1989, c. 623; 1990, cc. 360, 781, 919; 1992, c. 286; 1993, cc. 214, 469, 476, 496; 1994, c. 614; 1995, c. 442; 1996, c. 236; 1997, c. 875; 1999, cc. 580, 584, 611, 613, 947; 2000, cc. 420, 422; 2006, c. 62; 2007, c. 23; 2012, c. 581; 2020, c. 621.