Utah Code Ann. § 17-79-703
(1) As used in this section:
(a)
(2) Unless exempt under Section 17-79-708 or excluded from the definition of subdivision under Section 17-79-102, whenever any land is laid out and platted, the owner of the land shall provide to the county in which the land is located an accurate plat that describes or specifies:
(d) every existing right-of-way and recorded easement located within the plat for:
(e) any water conveyance facility located, entirely or partially, within the plat that:
(ii) of which the owner of the land has actual or constructive knowledge, including from information made available to the owner of the land:
(3)
(c) A county may not require that a plat be approved or signed by a person or entity who:
(ii) does not:
(d) A county shall:
(i) within 20 days after the day on which an owner of land submits to the county a complete subdivision plat land use application, mail written notice of the proposed subdivision to the facility owner of any water conveyance facility located, entirely or partially, within 100 feet of the subdivision plat, as determined using information made available to the county:
(ii) not approve the subdivision plat for at least 20 days after the day on which the county mails to each facility owner the notice under Subsection (3)(d)(i) in order to receive any comments from each facility owner regarding:
(5)
(a) Within 30 days after approving a final plat under this section, a county shall submit to the Utah Geospatial Resource Center, created in Section 63A-16-505, for inclusion in the unified statewide 911 emergency service database described in Subsection 63H-7a-304(4)(b):
(b) If requested by the Utah Geospatial Resource Center, a county that approves a final plat under this section shall:
(6)
(a) A county recorder may not record a plat unless, subject to Subsection 17-79-704(1):
(b) A surveyor who prepares the plat shall certify that the surveyor:
(ii)
(c)
(i) To the extent possible, the surveyor shall consult with the owner or operator, or a representative designated by the owner or operator, of an existing water conveyance facility located within the proposed subdivision, or an existing or proposed underground facility or utility facility located within the proposed subdivision, to verify the accuracy of the surveyor's depiction of the:
(ii) The cooperation of an owner or operator of a water conveyance facility, underground facility, or utility facility under Subsection (6)(c)(i):
(7)
Renumbered and Amended by Chapter 14, 2025 Special Session 1