- (1) The Committee, or its appointed representative will determine the certifications that will be required.
- (2) Depending on the nature and extent of the modification the Committee, or its appointed representative may require an Acceptance Inspection and Test.
- (3) The following certifications may be required: design; construction, and an as-built profile.
- (4) The certifications must be submitted by a qualified engineer and attached to the cover of the modification documents. The modification documents must include the drawings, descriptions, or specifications pertaining to the affected systems and their connections with existing systems.
- (5) A revised lift data form must be submitted.
- (6) The ropeway must not resume operating until authorized by the Committee, or its appointed representative.
KEY: transportation safety, tramways, ropeways, tramway permits
Date of Last Change: April 3, 2024
Notice of Continuation: June 22, 2022
Authorizing, and Implemented or Interpreted Law: 72-11-201 through 72-11-216