- (1) To obtain a grant under this rule, a project proponent shall submit a written application to the division, on or before the application deadline date established by the division.
(2) Each project proponent shall apply using the division's approved form and shall include the following information:
- (a) detailed and itemized cost estimate of the proposed project, study, design, or construction prepared by a licensed professional engineer;
- (b) map showing the location of the proposed project;
- (c) designs and schematics detailing project construction particulars;
- (d) estimated timeline for the project, including the projected start date and expected completion date;
- (e) estimated useful life of the project;
- (f) number of people that will benefit from the project;
- (g) matching funds to be contributed, if any, by the project proponent; and
- (h) any additional information required on the application.
- (3) Each application shall be signed and dated by an authorized representative of the project proponent and include the project proponent's verification that information provided in the application is accurate and that any estimates or projections submitted are based on sound professional judgement and best available data.
KEY: 2024 Grant Funding for Water Infrastructure Projects
Date of Last Change: June 21, 2024
Authorizing, and Implemented or Interpreted Law: 63G-3-201(2); H.B. 3, Item 54, 2024 General Session