- (1) Eligible costs for hydroenergy systems must conform with Section R362-2-5 and meet the requirements contained in this Section.
- (2) Eligible equipment costs for a hydroenergy system are limited to components up to the point of interconnection with AC service when powering a building, or up to the point of interconnection with the electrical grid for systems intended solely for the sale of power.
KEY: energy, renewable, tax credits, solar
Date of Last Change: July 29, 2020
Notice of Continuation: August 22, 2022
Authorizing, and Implemented or Interpreted Law: 59-7-614; 59-10-1014; 59-10-1106