Utah Admin. Code R315-319-83
(1) Each CCR surface impoundment and any lateral expansion of a CCR surface impoundment shall be examined by a qualified person as follows:
(i) at intervals not exceeding seven days, inspect for any appearances of actual or potential structural weakness and other conditions that are disrupting or have the potential to disrupt the operation or safety of the CCR unit;
(2) Timeframes for inspections by a qualified person
(i) Existing CCR surface impoundments. The owner or operator of the CCR unit shall initiate the inspections required under Subsection R315-319-83(a) no later than October 19, 2015.
(1) If the existing or new CCR surface impoundment or any lateral expansion of the CCR surface impoundment is subject to the periodic structural stability assessment requirements under Subsection R315-319-73(d) or Subsection R315-319-74(d), the CCR unit shall additionally be inspected on a periodic basis by a qualified professional engineer to ensure that the design, construction, operation, and maintenance of the CCR unit is consistent with recognized and generally accepted good engineering standards. The inspection shall, at a minimum, include:
(i) a review of available information regarding the status and condition of the CCR unit, including, but not limited to, files available in the operating record, for example, CCR unit design and construction information required by Subsections R315-319-73(c)(1) and R315-319-74(c)(1), previous periodic structural stability assessments required under Subsections R315-319-73(d) and R315-319-74(d), the results of inspections by a qualified person, and results of previous annual inspections;
(2) Inspection report. The qualified professional engineer shall prepare a report following each inspection that addresses the following:
(i) any changes in geometry of the impounding structure since the previous annual inspection;
(3) Timeframes for conducting the initial inspection.
(i) Existing CCR surface impoundments. The owner or operator of the CCR unit shall finish the initial inspection required by Subsections R315-319-83(b)(1) and R315-319-83(b)(2) no later than January 18, 2016.
(4) Frequency of inspections.
(i) Except as provided for in Subsection R315-319-83(b)(4)(ii), the owner or operator of the CCR unit shall conduct the inspection required by Subsections R315-319-83(b)(1) and R315-319-83(b)(2) on an annual basis. The date of completing the initial inspection report is the basis for establishing the deadline to finish the first subsequent inspection. Any required inspection may be conducted before the required deadline if the owner or operator places the completed inspection report into the facility's operating record within a reasonable amount of time. In each case, the deadline for completing subsequent inspection reports is based on the date of completing the previous inspection report. For Section R315-319-83, the owner or operator has finished an inspection when the inspection report has been placed in the facility's operating record as required by Subsection R315-319-105(g)(6).
(5) If a deficiency or release is identified during an inspection, the owner or operator shall remedy the deficiency or release as soon as feasible and prepare documentation detailing the corrective measures taken.