- (a) Each owner or operator of a CCR unit subject to the requirements of Sections R315-319-50 through R315-319-107 shall maintain a publicly accessible internet site, CCR web site, containing the information specified in Section R315-319-107. The owner or operator's web site shall be titled "CCR Rule Compliance Data and Information." The website shall ensure that the information required to be posted is immediately available to anyone visiting the site, without requiring any prerequisite, such as registration or a requirement to submit a document request. The required information shall be clearly identifiable and shall be able to be immediately printed and downloaded by anyone accessing the site. If the owner or operator changes the web address, that is the Uniform Resource Locator (URL) at any point, they shall notify the director within 14 days of making the change. The facility's CCR website shall also have a "contact us" form or a specific email address posted on the website for the public to use to submit questions and issues relating to the availability of information on the website.
- (b) An owner or operator of more than one CCR unit subject to Sections R315-319-50 through R315-319-107 may comply with the requirements of Section R315-319-107 by using the same internet site for multiple CCR units provided the CCR web site clearly delineates information by the name or identification number of each unit.
- (c) Unless otherwise required in Section R315-319-107, the information required to be posted to the CCR web site shall be made available to the public for at least five years following the date on which the information was first posted to the CCR web site.
- (d) Unless otherwise required in Section R315-319-107, the information shall be posted to the CCR web site within 30 days of placing the pertinent information required by Section R315-319-105 in the operating record.
- (e) Location restrictions. The owner or operator of a CCR unit subject to Sections R315-319-50 through R315-319-107 shall place each demonstration specified under Subsection R315-319-105(e) on the owner or operator's CCR web site.
- (f) Design criteria. The owner or operator of a CCR unit subject to Sections R315-319-50 through R315-319-107 shall place the information required by Subsections R315-319-107(f)(1) through R315-319-107(f)(23) on the owner or operator's CCR web site:
- (1) within 60 days of commencing construction of a new unit, the design certification specified under Subsection R315-319-105(f)(1) or R315-319-105(f)(3);
- (2) no later than the date of initial receipt of CCR by a new CCR unit, the construction certification specified under Subsection R315-319-105(f)(1) or R315-319-105(f)(3);
- (3) the documentation of liner type specified under Subsection R315-319-105(f)(2);
- (4) the initial and periodic hazard potential classification assessments specified under Subsection R315-319-105(f)(5);
- (5) the EAP specified under Subsection R315-319-105(f)(6), except that only the most recent EAP shall be maintained on the CCR web site irrespective of the time requirement specified in Subsection R315-319-107(c);
- (6) documentation prepared by the owner or operator recording the annual face-to-face meeting or exercise between representatives of the owner or operator of the CCR unit and the local emergency responders specified under Subsection R315-319-105(f)(7);
- (7) documentation prepared by the owner or operator recording any activation of the EAP specified under Subsection R315-319-105(f)(8);
- (8) the history of construction, and any revisions of it, specified under Subsection R315-319-105(f)(9);
- (9) the initial and periodic structural stability assessments specified under Subsection R315-319-105(f)(10);
- (10) the documentation detailing the corrective measures taken to remedy the deficiency or release specified under Subsection R315-319-105(f)(11);
- (11) the initial and periodic safety factor assessments specified under Subsection R315-319-105(f)(12);
- (12) the design and construction plans, and any revisions of them, specified under Subsection R315-319-105(f)(13);
- (13) the application and any supplemental materials submitted in support of the application specified under Subsection R315-319-105(f)(14);
- (14) the alternative liner demonstration specified under Subsection R315-319-105(f)(15);
- (15) the alternative liner demonstration specified under Subsection R315-319-105(f)(16);
- (16) the documentation prepared for the preliminary demonstration specified under Subsection R315-319-105(f)(17);
- (17) the notification of an incomplete application specified under Subsection R315-319-105(f)(18);
- (18) the decision on the application specified under Subsection R315-319-105(f)(19);
- (19) the final decision on the alternative liner demonstration specified under Subsection R315-319-105(f)(20);
- (20) the alternative source demonstration specified under Subsection R315-319-105(f)(21);
- (21) the final decision on the alternative source demonstration specified under Subsection R315-319-105(f)(22);
- (22) the final decision on the trend analysis specified under Subsection R315-319-105(f)(23); and
(23) the decision that the alternative source demonstration has been withdrawn specified under Subsection R315-319-105(f)(24).
- (g) Operating criteria. The owner or operator of a CCR unit subject to Sections R315-319-50 through R315-319-107 shall place the information required by Subsections R315-319-107(g)(1) through R315-319-107(g)(7) on the owner or operator's CCR web site:
- (1) the CCR fugitive dust control plan, or any subsequent amendment of the plan, specified under Subsection R315-319-105(g)(1) except that only the most recent plan shall be maintained on the CCR web site irrespective of the time requirement specified in Subsection R315-319-107(c);
- (2) the annual CCR fugitive dust control report specified under Subsection R315-319-105(g)(2);
- (3) the initial and periodic run-on and run-off control system plans specified under Subsection R315-319-105(g)(3);
- (4) the initial and periodic inflow design flood control system plans specified under Subsection R315-319-105(g)(4);
- (5) the periodic inspection reports specified under Subsection R315-319-105(g)(6);
- (6) the documentation detailing the corrective measures taken to remedy the deficiency or release specified under Subsection R315-319-105(g)(7); and
(7) the periodic inspection reports specified under Subsection R315-319-105(g)(9).
- (h) Groundwater monitoring and corrective action. The owner or operator of a CCR unit subject to Sections R315-319-50 through R315-319-107 shall place the information required by Subsections R315-319-107(h)(1) through R315-319-107(h)(11) on the owner or operator's CCR web site:
- (1) the annual groundwater monitoring and corrective action report specified under Subsection R315-319-105(h)(1);
- (2) the groundwater monitoring system certification specified under Subsection R315-319-105(h)(3);
- (3) the selection of a statistical method certification specified under Subsection R315-319-105(h)(4);
- (4) the notification that an assessment monitoring programs has been established specified under Subsection R315-319-105(h)(5);
- (5) the notification that the CCR unit is returning to a detection monitoring program specified under Subsection R315-319-105(h)(7);
- (6) the notification that one or more constituents in appendix IV to Rule R315-319 have been detected at statistically significant levels above the groundwater protection standard and the notifications to land owners specified under Subsection R315-319-105(h)(8);
- (7) the notification that an assessment of corrective measures has been initiated specified under Subsection R315-319-105(h)(9);
- (8) the assessment of corrective measures specified under Subsection R315-319-105(h)(10);
- (9) the semiannual reports describing the progress in selecting and designing remedy and the selection of remedy report specified under Subsection R315-319-105(h)(12), except that the selection of the remedy report shall be maintained until the remedy has been completed;
- (10) the notification that the remedy has been completed specified under Subsection R315-319-105(h)(13); and
(11) the demonstration supporting the suspension of groundwater monitoring requirements specified under Subsection R315-319-105(h)(14).
- (i) Closure and post-closure care. The owner or operator of a CCR unit subject to Sections R315-319-50 through R315-319-107 shall place the information required by Subsections R315-319-107(i)(1) through R315-319-107(i)(2) on the owner or operator's CCR web site:
- (1) the notification of intent to initiate closure of the CCR unit specified under Subsection R315-319-105(i)(1);
- (2) the annual progress reports of closure implementation specified under Subsection R315-319-105(i)(2);
- (3) the notification of closure completion specified under Subsection R315-319-105(i)(3);
- (4) the written closure plan, and any amendment of the plan, specified under Subsection R315-319-105(i)(4);
- (5) the demonstrations for a time extension for initiating closure specified under Subsection R315-319-105(i)(5);
- (6) the demonstrations for a time extension for completing closure specified under Subsection R315-319-105(i)(6);
- (7) the notification of intent to close a CCR unit specified under Subsection R315-319-105(i)(7);
- (8) the notification of completion of closure of a CCR unit specified under Subsection R315-319-105(i)(8);
- (9) the notification recording a notation on the deed as required by Subsection R315-319-105(i)(9);
- (10) the notification of intent to comply with the alternative closure requirements as required by Subsection R315-319-105(i)(10);
- (11) the annual progress reports under the alternative closure requirements as required by Subsection R315-319-105(i)(11);
- (12) the written post-closure plan, and any amendment of the plan, specified under Subsection R315-319-105(i)(12);
- (13) the notification of completion of post-closure care specified under Subsection R315-319-105(i)(13);
- (14) the notification of intent to comply with the site-specific alternative to initiation of closure due to development of alternative capacity infeasible as specified under Subsection R315-319-105(i)(14);
- (15) the approved or denied demonstration for the site-specific alternative to initiation of closure due to development of alternative capacity infeasible as required by as specified under Subsection R315-319-105(i)(15);
- (16) the notification for requesting additional time to the alternative stop receipt of waste deadline as required by Subsection R315-319-105(i)(16);
- (17) the semiannual progress reports for the site-specific alternative to initiation of closure due to development of alternative capacity infeasible as specified under Subsection R315-319-105(i)(17);
- (18) the notification of intent to comply with the site-specific alternative to initiation of closure due to permanent cessation of a coal-fired boilers by a date certain as specified under Subsection R315-319-105(i)(18);
- (19) the approved or denied demonstration for the site-specific alternative to initiation of closure due to permanent cessation of a coal-fired boilers by a date certain as required by Subsection R315-319-105(i)(19); and
(20) the annual progress report for the site-specific alternative to initiation of closure due to permanent cessation of a coal-fired boilers by a date certain as required by Subsection R315-319-105(i)(20).
- (j) Retrofit criteria. The owner or operator of a CCR unit subject to Sections R315-319-50 through R315-319-107 shall place the information required by Subsections R315-319-107(j)(1) through R315-319-107(j)(6) on the owner or operator's CCR web site:
- (1) the written retrofit plan, and any amendment of the plan, specified under Subsection R315-319-105(j)(1);
- (2) the notification of intent to comply with the alternative retrofit requirements as required by Subsection R315-319-105(j)(2);
- (3) the annual progress reports under the alternative retrofit requirements as required by Subsection R315-319-105(j)(3);
- (4) the demonstrations for a time extension for completing retrofit activities specified under Subsection R315-319-105(j)(4);
- (5) the notification of intent to retrofit a CCR unit specified under Subsection R315-319-105(j)(5); and
- (6) the notification of completion of retrofit activities specified under Subsection R315-319-105(j)(6).
KEY: permit, solid waste, coal ash
Date of Last Change: September 15, 2025
Notice of Continuation: June 16, 2026
Authorizing, and Implemented or Interpreted Law: 19-6-108