- (a) Landfills disposing of coal combustion residuals and surface impoundments containing coal combustion residuals shall have a permit for a Class I, II, or V landfill or a coal combustion residuals permit issued under Rule R315-319.
- (b) An application for a permit for a coal combustion residual landfill or surface impoundment or multiple landfills and impoundments at a facility covered by one permit shall be made to the director.
- (c)(1) An application for a permit for a Coal Combustion Residue (CCR) unit shall contain the information required in Sections R315-319-60 through R315-319-107. No information needs be submitted for which the effective date in Sections R315-319-60 through R315-319-107 has not been reached when the application is submitted.
(2) Information required in Sections R315-319-60 through R315-319-107 with an effective date that falls later that the application submittal required in Subsection R315-319-1(c)(1) shall be submitted within six months of the effective date of the requirement found in Sections R315-319-60 through R315-319-107.
- (d) Permit application procedures shall follow the requirements of Sections R315-310-1 and R315-310-2.
- (e) Permit transfers shall follow the procedures of Section R315-310-11.
- (f) Permit applicants shall follow the notification requirements of Subsection R315-310-3(2).
- (g) Permit approvals shall follow the requirements of Rule R315-311.
- (h) The director approvals required in Sections R315-319-60 through R315-319-107 are satisfied by the issuance of a permit by the director.
KEY: permit, solid waste, coal ash
Date of Last Change: September 15, 2025
Notice of Continuation: June 16, 2026
Authorizing, and Implemented or Interpreted Law: 19-6-108