- (1) The owner or operator of a landtreatment disposal facility shall design the facility to provide interim waste storage areas that meet the requirements for piles, as specified in Rule R315-314.
- (2) The facility shall have systems to collect and treat any runoff from a 25 year storm, and divert any runon for the maximum flow of a 25 year storm around the active area.
- (3) The facility shall be designed to avoid standing water anywhere on the active area.
- (4) The facility shall be designed to avoid slopes and other features that will lead to soil and waste erosion, unless contour plowing or other measures are taken to avoid erosion.
- (5) The owner or operator shall monitor ground water according to Rule R315-308.
- (6) The owner or operator shall control access to the facility by fencing or other means and erect a sign as specified in Subsection R315-303-3(8).
KEY: solid waste management, waste disposal
Date of Last Change: September 15, 2025
Notice of Continuation: November 30, 2022
Authorizing, and Implemented or Interpreted Law: 19-6-104; 19-6-105; 19-6-108