Utah Admin. Code R315-266-108
(1) the quantity of hazardous waste burned in a device for a calendar month does not exceed the limits provided in the following table based on the terrain-adjusted effective stack height as defined in Subsection R315-266-106(b)(3):
Table 1Exempt Quantities for Small Quantity Burner ExemptionTerrain-adjusted effective stack height of device in metersAllowable hazardous waste burning rate, gallons per month0 to 3.904.0 to 5.9136.0 to 7.9188.0 to 9.92710.0 to 11.94012.0 to 13.94814.0 to 15.95916.0 to 17.96918.0 to 19.97620.0 to 21.98422.0 to 23.99324.0 to 25.910026.0 to 27.911028.0 to 29.913030.0 to 34.914035.0 to 39.917040.0 to 44.921045.0 to 49.926050.0 to 54.933055.0 to 59.940060.0 to 64.949065.0 to 69.961070.0 to 74.968075.0 to 79.976080.0 to 84.985085.0 to 89.996090.0 to 94.9110095.0 to 99.91200100.0 to 104.91300105.0 to 109.91500110.0 to 114.91700115.0 or greater1900
(4) the hazardous waste fuel does not contain, and is not derived from, EPA Hazardous Waste Nos. F020, F021, F022, F023, F026, or F027.
(c) Multiple stacks. If an owner or operator burns hazardous waste in more than one on-site boiler or industrial furnace exempt under Section R315-266-108, the quantity limits provided by Subsection R315-266-108(a)(1) are implemented according to the following equation:
The summation of Actual Quantity Burned(i)/Allowable quantity Burned(i) for i = 1 to n is less than or equal to 1.0
where:
n means the number of stacks;
Actual Quantity Burned means the waste quantity burned per month in device "i";
Allowable Quantity Burned means the maximum allowable exempt quantity for stack "i" from the table in Subsection R315-266-108(a)(1).
(1) Hazardous wastes that are subject to the conditions for exemption for very small quantity generators under Section R315-262-14 may be burned in an off-site device under the exemption provided by Section R315-266-108, but shall be included in the quantity determination for the exemption.
(3) The maximum quantity of hazardous waste that the facility may burn per month as provided by Subsection R315-266-108(a)(1).
KEY: hazardous waste
Date of Last Change: November 17, 2025
Notice of Continuation: December 11, 2025
Authorizing, and Implemented or Interpreted Law: 19-6-105; 19-6-106