- (a) Before transporting or offering hazardous waste for transportation off-site, a generator shall mark each package of hazardous waste in accordance with the applicable Department of Transportation regulations on hazardous materials under 49 CFR part 172;
- (b) Before transporting hazardous waste or offering hazardous waste for transportation off site, a generator shall mark each container of 119 gallons or less used in such transportation with the following words and information in accordance with the requirements of 49 CFR 172.304:
- (1) HAZARDOUS WASTE-Federal Law Prohibits Improper Disposal. If found, contact the nearest police or public safety authority or the U.S. Environmental Protection Agency.
- (2) Generator's Name and Address ____.
- (3) Generator's EPA Identification Number ____.
- (4) Manifest Tracking Number ____.
(5) EPA Hazardous Waste Number(s) ____.
- (c) A generator may use a nationally recognized electronic system, such as bar coding, to identify the EPA Hazardous Waste Number(s), as required by Subsection R315-262-32(b)(5) or paragraph (d).
- (d) Lab packs that will be incinerated in compliance with Subsection R315-268-42(c) are not required to be marked with EPA Hazardous Waste Number(s), except D004, D005, D006, D007, D008, D010, and D011, where applicable.
KEY: hazardous waste, generators
Date of Last Change: November 17, 2025
Notice of Continuation: December 11, 2025
Authorizing, and Implemented or Interpreted Law: 19-6-105; 19-6-106