Utah Admin. Code R315-262-264
At all times, there shall be at least one employee either on the generator's premises or on call, i.e., available to respond to an emergency by reaching the facility within a short period of time, with the responsibility for coordinating all emergency response measures and implementing the necessary emergency procedures outlined in Section R315-262-265. Although responsibilities may vary depending on factors such as type and variety of hazardous waste(s) handled by the facility, as well as type and complexity of the facility, this emergency coordinator shall be thoroughly familiar with all aspects of the generator's contingency plan, all operations and activities at the facility, the location and characteristics of hazardous waste handled, the location of all records within the facility, and the facility's layout. In addition, this person shall have the authority to commit the resources needed to carry out the contingency plan.
KEY: hazardous waste, generators
Date of Last Change: November 17, 2025
Notice of Continuation: December 11, 2025
Authorizing, and Implemented or Interpreted Law: 19-6-105; 19-6-106