- (1) An owner or operator of a portable aggregate processing plant shall submit a Notice of Temporary Relocation to the director and obtain a Temporary Relocation Approval Letter before operating a portable source at any location.
(2) A Notice of Temporary Relocation shall include the following:
- (a) the address and driving directions of the proposed location;
(b) a list of the equipment to be operated at the proposed location, including the:
- (i) type of equipment;
- (ii) rated capacity of the equipment; and
- (iii) date of manufacture of the equipment;
- (c) a site diagram showing the general equipment location on site to scale; and
- (d) the distance to the nearest houses, barns, or commercial operations to scale if the plant boundary is located within one mile of these buildings;
- (e) the expected startup and completion dates for operating at the proposed location;
- (f) the expected hours of operation, including start and stop times;
- (g) the emission control measures that the owner or operator proposes to adopt for each emission point at each location, including a fugitive dust control plan specific to the proposed location; and
(h) if relocating an asphalt plant, either:
- (i) the results and the date of the most recent stack test for the asphalt plant; or
- (ii) the anticipated stack test date and the stack test protocol for an asphalt plant that has not been stack tested.
KEY: air pollution, permits, approval orders, greenhouse gases
Date of Last Change: March 31, 2025
Authorizing, and Implemented or Interpreted Law: 19-2-104(3)(b)(iii); 19-2-108