- (a) Before the department will provide route information to the Texas Department of Motor Vehicles for the issuance of the oversize and overweight permit for a superheavy load, the department must receive from an engineering firm certified under this subchapter a written report that includes a detailed structural analysis of the bridges on the proposed route demonstrating that the bridges and culverts on the route are capable of sustaining the load.
- (b) The report must be submitted in the form prescribed by the department.
- (c) Failure to submit a report in the prescribed form may result in non-consideration of the analysis.
Source Note:The provisions of this §28.86 adopted to be effective November 21, 2013, 38 TexReg 8251.