Nonstandard boilers shall be prepared for inspection as described in §65.210, with the following additional requirements.
- (1) External lagging and insulation shall be removed and ultrasonic thickness measurements shall be performed for the first inspection and at five-year intervals for subsequent inspections; and
- (2) Any other inspections or examinations as required by the department shall be performed to determine the condition of the boiler.
Source Note:The provisions of this §65.211 adopted to be effective June 15, 2015, 40 TexReg 3121.