The pump installer shall:
- (1) verify all owner information prior to installing any components of a shallow closed-loop geothermal system;
- (2) verify that all the pumps, tubing, and connections from the well to the infrastructure and the geothermal heat exchange system are installed, tested, and backfilled in a manner that is consistent with this subchapter and any other applicable local, state, or federal guidelines, regulations, and ordinances;
- (3) install all subsurface infrastructure such as loops or tubing; and
- (4) comply with all other applicable state regulations, statutes, and local ordinances.
Source Note:The provisions of this §6.108 adopted to be effective January 6, 2025, 50 TexReg 103.