- (a) The commission shall determine the amount of the bond required for each bonded area.
(b) The amount of the bond shall:
(1) reflect the probable difficulty of the reclamation, considering factors including:
- (A) topography;
- (B) geology of the site;
- (C) hydrology; and
- (D) revegetation potential; and
- (2) be sufficient to assure completion of the reclamation plan if the commission has to perform the work in the event of forfeiture.
- (c) The bond for the entire area under one permit may not be less than $10,000.
Added by Acts 1995, 74th Leg., ch. 76, Sec. 12.02(a), eff. Sept. 1, 1995.