- (a) If the commission determines that the cost of a project analysis is not justified or required, the commission shall, in cooperation with the using agency, develop a realistic estimate of the project's cost.
- (b) If necessary, the commission shall arrange for an on-site inspection and analysis of the proposed project by a commission staff member.
- (c) The commission shall inform a using agency of a cost estimate developed under this section.
Added by Acts 1995, 74th Leg., ch. 41, Sec. 1, eff. Sept. 1, 1995.