Tenn. Comp. R. & Regs. 0720-21-.13
(1) The administration of every facility shall have in effect and available for all supervisory personnel and staff, written copies of the following required disaster plans for the protection of all persons in the event of fire and other emergencies for evacuation to areas of refuge and/or evacuation from the building. A detailed log with staff signatures of training received shall be maintained. All employees shall be trained annually as required in the following plans and shall be kept informed with respect to their duties under the plans. A copy of the plans and the specific emergency numbers related to that type of disaster shall be readily available at all times. Each of the following plans shall be exercised annually:
(a) Fire Safety Procedures Plan shall include:
(b) Tornado/Severe Weather Procedures Plan shall include:
(c) Bomb Threat Procedures Plan:
(d) Flood Procedure Plan, if applicable:
(e) Severe Cold Weather and Severe Hot Weather Procedure Plans:
(f) Earthquake Disaster Procedures Plan:
(2) Emergency Planning with Local Government Authorities.
(3) For facilities which elect to have an emergency generator, the generator shall be designed to meet the facility’s HVAC and essential needs and shall have a minimum of twenty-four (24) hours of fuel designed to operate at its rated load. This requirement shall be coordinated with the Disaster Preparedness Plan or with local resources.
Authority: T.C.A. §§ 68-11-202, 68-11-204, 68-11-206, and 68-11-209. Administrative History: Original rule filed February 9, 1998; effective April 25, 1998. Repeal and new rule filed July 27, 2000; effective October 10, 2000. Transferred from chapter 1200-08-11 pursuant to Public Chapter 1119 of 2022 effective July 1, 2022. Amendments filed December 18, 2025; effective March 18, 2026.