- (1) When requested by the Supervisor or his representative, wellhead connections shall be tested prior to installation at a pressure indicated by the Supervisor in conformance with conditions existing in areas in which they are used.
- (2) Whenever such tests are made in the field, they shall be witnessed by the Supervisor.
- (3) Tubing and tubingheads shall be free from obstructions in wells used for bottomhole pressure test purposes.
Authority: T.C.A §§ 60-1-201 et seq., and 4-5-201 et seq. Administrative History: Original rule filed March 20, 2013.