This rule outlines the procedures on development and procurement of reclamation specifications for those projects that involve comprehensive reclamation practices.
(1) Upon selection of a preferred reclamation alternative for a given project an outline of required specifications shall be constructed. Items for consideration include:
- (a) An existing site map.
(b) Earthwork specifications.
- 1. Mobilization.
- 2. Construction Staking.
- 3. Clearing and Grubbing.
- 4. Backfill.
- 5. Sediment Structures.
- 6. Grading.
- 7. Diversion Ditches.
- 8. Special Conditions.
- (c) Water treatment and disposal specifications.
- (d) Revegetation specifications.
- (e) Bid schedule.
- (f) A proposed grade map.
- (g) Any other special conditions.
- (2) Upon completion of the specification outline, the specifications will be constructed, either by in-house state personnel, other government agency personnel, consultants, or a combination of the above.
- (3) The specifications will then be utilized in the procurement of reclamation contractors and in the actual reclamation process.
Authority: T.C.A. §§ 59-8-324 et seq. and 4-5-201 et seq. Administrative History: Original rule filed April 9, 2013; effective July 8, 2013. Rule renumbered from 0400-01-24.