The Division shall:
- (1) Identify all abandoned mine land problem areas in the Tennessee coalfields.
- (2) Conduct a site investigation on those problem areas that are eligible for further development.
- (3) Rank and select reclamation projects.
- (4) Conduct a site evaluation including a proposal of reclamation alternatives.
- (5) Prepare an environmental assessment for each project site.
- (6) Select a preferred reclamation alternative.
- (7) Make a lien determination on the project site as required by T.C.A. § 59-8-325.
- (8) Obtain a right of entry for reclamation.
- (9) Apply for the administrative and construction grants to carry out the proposed projects.
- (10) Procure reclamation contractors upon receipt of grant.
- (11) Monitor all reclamation activities.
- (12) Prepare a final report on all projects.
- (13) Maintain project sites until a stable condition is achieved.
Authority: T.C.A. §§ 59-8-324 et seq. and 4-5-201 et seq. Administrative History: Original rule filed April 9, 2013; effective July 8, 2013. Rule renumbered from 0400-01-24.