For SDCL 45-6B-6(8) , a permit application is considered procedurally complete if the following items are included:
- (1) A narrative description of the mining and milling techniques to be employed;
- (2) A narrative description of and plan view maps depicting the premining contours and proposed postmining topography;
- (3) A narrative description of the proposed depth and direction of mining and representative cross-sections depicting the premining and proposed postmining land surface;
- (4) A map depicting the proposed locations of tailings dams, waste dumps, ore stockpiles, or other mine spoil material;
- (5) A stability analysis for all critical earth structures; and
- (6) A description of the proposed blast procedures and a proposed program for mitigating resulting fugitive dust, noise, and potential structural or stability damage outside the permit area.
Source: 14 SDR 111, effective March 3, 1988.
General Authority: SDCL 45-6B-81.
Law Implemented: SDCL 45-6B-6.