ARSD 74:02:08:07.02
Unless the reservoir of a category 2 dam serves as the sole water supply source for a water distribution system, the spillway design flood for a new or rebuilt intermediate size category 2 dam may be lowered to a design flood between the 0.5 PMF and 100-year spillway design flood based upon a risk assessment. The risk assessment must be submitted to and approved by the chief engineer.
Source: 14 SDR 67, effective November 8, 1987.
General Authority: SDCL 46-2-5 , 46-7-3.
Law Implemented: SDCL 46-5-8 , 46-5-30 , 46-7-3 , 46-7-5.