An applicant shall submit a utility corridor permit application on a form approved by the department. The application shall include the following:
- (1) The name and address of the applicant;
- (2) The description of the location of the utility corridor where the utility line or facility will be relocated or installed;
- (3) The type of utility installation requested;
- (4) Whether the utility line or facility has been displaced as a result of a highway construction project and, if so, the project that caused the displacement and the location of the utility line or facility prior to the displacement;
- (5) The name and address of the person to whom any notice required by these rules shall be given;
- (6) A proposed utility corridor installation plan or design;
- (7) Proof of liability insurance which is adequate for the liabilities presented; and
- (8) The signature of the applicant.
Source: 32 SDR 32, effective August 30, 2005.
General Authority: SDCL 31-19-1.1.
Law Implemented: SDCL 31-19-1.1.