The owner or user of the boiler shall prepare for an external inspection by:
- (1) Installing all handhold plates, washout plugs, and inspection plugs;
- (2) Filling the boiler with water to the desired level in preparation for firing the boiler;
- (3) Installing the safety valves, steam gauge, and other essential equipment needed to build up and maintain normal operating pressure; and
- (4) Removing all lagging and insulation.
Source: 23 SDR 139, effective March 5, 1997.
General Authority: SDCL 34-29A-14.1.
Law Implemented: SDCL 34-29A-14.1.