A bulk commercial fertilizer storage facility permit application must include the following:
(1) Name, address, and telephone number of the following:
- (a) The firm applying for a permit;
- (b) The firm that will operate the facility; and
- (c) The firm that will construct, install, or modify the site, if known;
- (2) Type of facility (new, existing, or altered);
- (3) Location of the facility (county, city, and township);
- (4) Legal description of the facility location;
- (5) Size of the lot owned or leased;
- (6) Nature of the terrain (such as level area, steep slope);
- (7) Type of storage containers (such as steel, poly, wood);
- (8) Number of containers, their dimensions, and the capacity of each storage container;
- (9) Copies of required local permits;
- (10) Soil and groundwater conditions (general soil type at the site, such as clay, gravel, sand, or loam, and the type, depth, and proximity of wells on or near the site);
- (11) Surface water (approximate distance to and identity of any nearby lake, stream, drainage ditch, or storm drain into which liquid could flow);
- (12) Two scale drawings of plans and specifications for the facility, including other storage containers and buildings;
- (13) Two copies of the plumbing diagram for the facility showing location and type of pumps and valves used to control all transferring;
- (14) If a synthetic liner is used, a copy of the manufacturer's letter of compatibility and his written proof of certification of those qualified to install the liner;
- (15) Signature, date of signature, and title of the person certifying information on the application; and
- (16) Date of review by the secretary.
Source: 15 SDR 194, effective July 1, 1989.
General Authority: SDCL 38-19-36 , 38-19-36.1 , 38-19-36.2.
Law Implemented: SDCL 38-19-36.2.