A. Prior to the plugging or abandonment of any injection well the permittee shall:
- (1) Provide advance notice of 180 days to the Department;
(2) Submit a revised plugging and abandonment plan to the Department which shall include:
- (a) The type and number of plugs to be used;
- (b) The type, grade and quantity of cement to be used;
- (c) The proposed location in the well of each plug including the elevation of the top and bottom;
- (d) A description of the placement method for the plugs. (Placement of the cement plugs shall be by the balance method, the dump bailer method, the two-plug method, or an alternative method approved by the Department which will reliably provide a comparable level of protection to underground sources of drinking water.)
- (e) Well construction design details.
- B. The well to be abandoned shall be in a state of static equilibrium with the mud weight equalized top to bottom, by a method prescribed by the Department prior to the placement of the cement plug(s).
- C. Prior to granting final approval to abandon an injection well, the permittee shall demonstrate to the satisfaction of the Department that the well has been plugged in such a manner which will not allow the movement of fluids either into or between underground sources of drinking water.
HISTORY: Added by State Register Volume 7, Issue No. 6, eff June 24, 1983.