The owner must provide and maintain written jump procedures which must include at least the following procedures:
- (1) exclusion of all unauthorized persons from the operating area;
(2) registration of jumpers, to include:
- (a) name;
- (b) age;
- (c) weight;
- (3) jumper briefing;
- (4) removal of loose objects from the jumper;
(5) preparation of the jumper which shall include:
- (a) harness;
- (b) instructions to the jumper;
- (c) selection and adjustment of the bungee cord;
- (d) connection of the jumper to the lowering system;
- (e) recheck of all connection and harness attachments;
- (f) final inspection by jump master;
- (g) final inspection of jumper;
- (h) countdown to jump;
- (i) observation of jump;
- (6) landing and recovery of jumper;
- (7) off-loading of jumper;
- (8) return of jumper to the public area;
- (9) retrieval of the bungee cord to the platform.
HISTORY: 1994 Act No. 408, Section 33, eff 60 days after May 24, 1994.