58 Pa.C.S. § 3233
(a) General rule.— A person who operates or proposes to operate a storage reservoir, except one filled by the secondary recovery or gas recycling process, shall:
(c) Wells to be reconditioned.— The following shall apply:
(1) To comply with subsection (a), wells which are to be reconditioned shall, unless the department by regulation specifies a different procedure, be cleaned out from the surface through the storage horizon, and the producing casing and casing strings determined not to be in good physical condition shall be replaced with new casing, using the same procedure as is applicable to drilling a new well under this chapter. In the case of wells to be used for gas storage, the annular space between each string of casing and the annular space behind the largest diameter casing to the extent possible shall be filled to the surface with cement or bentonitic mud or a nonporous material approved by the department under section 3221. At least 15 days prior to reconditioning, the storage operator shall give notice to the department, setting forth in the notice the manner in which it is planned to recondition the well and any pertinent data known to the storage operator which will indicate the condition of the well existing at that time. In addition, the storage operator shall give the department at least 72 hours' notice of the time when reconditioning is to begin. If no objections are raised by the department within ten days, the storage operator may proceed with reconditioning in accordance with the plan as submitted. If objections are made by the department, the department may fix a time and place for a conference under section 3251 (relating to conferences) at which the storage operator and department shall endeavor to agree on a plan to satisfy the objections and meet the requirements of this section. If no agreement is reached, the department may, by an appropriate order, determine whether the plan, as submitted, meets the requirements of this section or what changes, if any, are required. If, in reconditioning a well in accordance with the plan, physical conditions are encountered which justify or necessitate a change in the plan, the storage operator may request that the plan be changed. If the request is denied, the department shall fix a conference under section 3251 and proceed in the same manner as with original objections. An application may be made in the manner prescribed by section 3221 for approval of an alternative method of reconditioning a well. If a well located within the storage reservoir was reconditioned, or drilled and equipped, prior to April 18, 1985, the obligations imposed by subsection (a), as to reconditioning the well, shall be considered fully satisfied if, on the basis of the data, information and other evidence submitted to the department, it is determined that:
(d) Exception.— The requirements of subsection (a) shall not apply to injection of gas into a stratum when the sole purpose of injection, referred to in this subsection as testing, is to determine whether the stratum is suitable for storage purposes. Testing shall be conducted only in compliance with the following requirements:
(e) Failure to execute lawful order.— In a proceeding under this chapter, if the department determines that an operator of a storage reservoir has failed to carry out a lawful order issued under this chapter, the department may require the operator to suspend operation of the reservoir and withdraw the gas until the violation is remedied, in which case the storage operator, limited by due diligence insofar as existing facilities utilized to remove gas from the reservoir will permit, shall:
(f) Duty of storage reservoir operator.— The following shall apply:
(1) A person owning or operating a storage reservoir subject to this chapter shall have a duty to: