(b) An entity’s purpose for petitioning the Commission for approval of a DWSL program shall be linked to:
- (1) Excessive I&I causing, or which is reasonably expected to cause within the next 5 years, a hydraulically overloaded condition, wastewater overflows or additional flow which is prudent for the entity to avoid.
- (2) Design or construction conditions causing, or which are reasonably expected to cause within the next 5 years, wastewater overflows.