- (a) Steam traps and trap piping assemblies shall be inspected for general condition and proper operation at least once a year.
- (b) Blow-off valves shall be checked for operability immediately prior to closing each associated main valve during a scheduled shutdown of a section of the steam distribution pipeline system. Removal of condensate from a shutdown section of pipeline shall be accomplished prior to reopening main valves.
- (c) Accessible expansion joints shall be inspected at least twice annually. The inspection shall include checks for leakage, proper alignment and traverse measurement.
- (d) Service valves owned by the utility located within the customer’s building shall be inspected at least once annually.
- (e) Manholes owned by the utility containing steam facilities shall be inspected for general conditions and adequacy of insulation at least once annually.
- (f) Remote system pressure indicating devices shall be inspected and tested for accuracy at least once every 2 years. At a minimum, pressure indicating gauges shall be installed at the interface between portions of the system which are designed for different operating pressures.
Authority
The provisions of this § 61.48 issued under the Public Utility Code, 66 Pa.C.S. § § 501 and 1501.
Source
The provisions of this § 61.48 adopted December 1, 2017, effective December 2, 2017, 47 Pa.B. 7314.