(h) A blowoff tank that is not vented as required in this section must meet one of the following requirements:
- (1) Constructed to withstand pressure equal to the pressure allowed on its attached boiler.
- (2) Equipped with a safety valve or valves of sufficient capacity to prevent the pressure from exceeding the safe working pressure of the tank.