The operator shall manage surface water and control erosion and sedimentation to:
- (1) Divert surface water away from the storage area with measures and structures necessary to handle surface water flows based on a 25-year, 24-hour precipitation event, supported by written calculations and also comply with Chapter 102 (relating to erosion control and sediment control).
- (2) Meet the requirements of Chapter 102 and Chapter 105 (relating to dam safety and waterway management).
- (3) Prevent erosion to the maximum extent possible, including where possible, using revegetation.
Source
The provisions of this § 279.232 amended December 22, 2000, effective December 23, 2000, 30 Pa.B. 6685. Immediately preceding text appears at serial page (266315).
Cross References
This section cited in 25 Pa. Code § 279.105 (relating to soil plan).