- (a) The application shall contain a plan describing the activities that are proposed to occur in preparation for closure and after closure to ensure compliance with this chapter.
(b) The closure plan shall include:
- (1) A plan for the decontamination and removal of equipment, structures and related material from the facility.
- (2) An estimate of the year in which final closure will occur, including an explanation of the basis for the estimate.
- (3) A description of the steps necessary for closure if the facility closes prematurely.
(4) A narrative description, including a schedule, of measures that are proposed to be carried out in preparation for closure and after closure at the facility, including measures relating to:
- (i) Water quality monitoring.
- (ii) Gas control and monitoring.
- (iii) Leachate collection and treatment.
- (iv) Erosion and sedimentation control.
- (v) Revegetation and regrading, including maintenance of the final cover.
- (vi) Access control, including maintenance of access control.
- (5) A description of the means by which funds will be made available to cover the cost of postclosure operations, which shall include an assessment of projected postclosure maintenance costs, a description of how the necessary funds will be raised, a description of where the funds will be deposited, copies of relevant legal documents and a description of how the funds will be managed prior to closure.
- (6) The name, address and telephone number at which the operator can be reached during the postclosure period.
Source
The provisions of this § 277.192 amended December 22, 2000, effective December 23, 2000, 30 Pa.B. 6685. Immediately preceding text appears at serial page (226283).
Cross References
This section cited in 25 Pa. Code § 277.131 (relating to basic requirements); and 25 Pa. Code § 277.322 (relating to closure).