25 Pa. Code § 275.417
If required by the Department, the operator shall conduct soil-pore water monitoring that meets the requirements of § 275.515 (Reserved), or another plan for accurately monitoring soil-pore water that is approved in the permit.
This section cited in 25 Pa. Code § 275.411 (relating to general requirements).