- (a) In addition to the requirements incorporated by reference, before an owner or operator of a facility that treats, stores or disposes of a specific hazardous waste from a specific generator for the first time, the owner or operator shall submit to the Department a notification that the facility intends to accept an additional waste stream generated by the specified generator. This notification shall include information that is specified in the facility’s permit.
- (b) If the notification information required in subsection (a) is not required by the facility’s permit, the owner or operator shall submit the information required by § 265a.13 (relating to general and generic waste analysis) until the permit is amended to require the notification information.