The operator shall manage surface water and control erosion and sedimentation to:
- (1) Divert surface water away from the storage and composting areas with measures and structures necessary to handle surface water flows based on a 25-year, 24-hour precipitation event, and supported by written calculations.
- (2) Meet the requirements of Chapters 102 and 105 (relating to erosion and sediment control; and dam safety and waterway management).
- (3) Prevent erosion to the maximum extent possible, including where possible, using revegetation.
Cross References
This section cited in 25 Pa. Code § 295.132 (relating to soil erosion and sedimentation control plan); and 25 Pa. Code § 295.212 (relating to access roads).