The operator shall manage surface water and control erosion and sedimentation to:
- (1) Divert surface water away from the storage area with measures and structures necessary to handle surface water flows based on a 25-year, 24-hour precipitation event, and supported by written calculations and also comply with Chapter 102 (relating to erosion control).
- (2) Meet the requirements of Chapters 102 and 105 (relating to erosion and sediment control; and dam safety and waterway management).
- (3) Prevent erosion to the maximum extent possible, including where possible, using revegetation.
Source
The provisions of this § 293.232 amended January 12, 2001, effective January 13, 2001, 31 Pa.B. 235. Immediately preceding text appears at serial page (266344).
Cross References
This section cited in 25 Pa. Code § 293.105 (relating to soil plan).