25 Pa. Code § 289.533
(a) The subbase shall meet the following performance standards. The subbase shall:
(b) Unless alternative design requirements to meet the performance standards in subsection (a) are approved as part of the permit under § 287.231 (relating to equivalency review procedure), the subbase shall meet the following design requirements. The subbase shall:
(1) Consist of an upper 6 inches that is:
This section cited in 25 Pa. Code § 287.114 (relating to interim operational requirements for unpermitted processing or disposal facilities); 25 Pa. Code § 287.116 (relating to interim operational requirements); 25 Pa. Code § 289.512 (relating to liner system and leachate control plan); 25 Pa. Code § 289.521 (relating to limitations); 25 Pa. Code § 289.531 (relating to scope and requirements); and 25 Pa. Code § 299.144 (relating to operating requirements).